“DTEK reported that the current situation with electricity supply is currently the most difficult this winter.”, — write: www.pravda.com.ua
illustrative photo: Ukrenergo Source: DTEK in the Kh network
Literally DTEK: “There are problems with electricity transmission in Dnipro and the region after strikes on high-voltage infrastructure.
Advertising:
In Kyiv, the enemy targeted the power generation at the time of extreme cold – when the load on the power system is the highest.”
Details: DTEK added that serious damage to networks due to bad weather was added to the consequences of the attack in Kyiv region. According to DTEK, 187 crews are working around the clock in Kyiv Oblast due to this situation.
We will remind: Energy workers restored power supply to another 60,000 homes in Kyiv; in total, after the massive shelling on January 8, electricity was restored to 648,000 homes.
