“Two people were injured due to the collapse of the bridge”, — write: www.radiosvoboda.org
On the evening of November 13, it became known about the collapse of the bridge, which is located over the railway tracks on the Dzhankoy-Mamut section. The Russian administration of the Dzhankoy district reported that the bridge could not withstand the weight of a heavy truck. At the time of the collapse, in addition to the truck, there was a car on the bridge. Two people were injured and hospitalized.
The restoration of the destroyed road bridge will take 3-4 months and will require 180-200 million rubles, the authorities of the occupied Crimea said. The works will be carried out in 2025, said Serhii Aksyonov, the head of the peninsula appointed by Russia.