“In the Carpathians, the repair of the railway at the site of the collapse between the stations of Yasin and Voronenko continues. Therefore, the routes of trains in this direction have made changes. According to Ukrzaliznytsya in Telegram, because of the accident, trains do not reach Rakhiv or Yasinya. As the company said, the flights are: №233, №55, №95 Kyiv – Rakhiv; №107 Kryvyi Rih – Yasina; №5 of Zaporozhye;”, – WRITE ON: ua.news
Railway repair continues in the Carpathians in place of the collapse Between Yasinya and Voronenko stations. Ago The routes of trains in this direction have made changes.
As reports “INKrzaliznytsI ”in Telegrambecause of the accident POttomans do not reach Rakhiv or Yasinya yet.
As noted in the company, it is about flights:
- №233, №55, №95 Kyiv – Rakhiv;
- №107 Kryvyi Rih – Yasinya;
- №5 Zaporozhye – Yasinya;
- №25 Odesa – Yasinya;
- №357 Kyiv – Yasinya;
- №143 Sumy – Rakhiv.
“All the following trains will run to the Vorokhta station,” the ultrasound was specified.
They also added that at the time of repair work, passengers will be brought by buses from and to final stations.
At the same time, during the repair work, experts have already unloaded 11 cars of rubble stone and started the formation of a counter -bank (the so -called “shelf”, which will allow to strengthen the embankment of the earthen cloth).
We will remind, yesterday, May 22, it became known that trains on the segment between the stations of Yasin and Voronenko were temporarily stopped. The reason for this was the collapse of the soil, which led to the railway.
Also, Ukrzaliznytsia has appointed an additional train at number 267/268 on the Kiev – Vinnytsia – Kiev route.
We have already reported that Ukrzaliznytsia again led the rating of the largest employers of Ukraine.